Add each conductor and hardware allowance for one ordinary, unpartitioned box. Compare required volume with verified usable space under NEC 2023.

Based on NEC 2023Runs in your browser
Inputs Local only
1 · Available box space
2 · Entering / spliced conductors
3 · Passing unbroken conductors
4 · Unbroken loops
5 · Entirely internal pigtails
6 · Clamps & supports
7 · Devices / yokes
8 · Equipment grounding
9 · Terminal-block assemblies

Calculation result NEC 2023

Complete the required fields

For estimation only. Results compare loads under the selected NEC method; they do not guarantee permit approval or code compliance. Verify with your local adopted code and a licensed electrician. Disclaimer

How the box fill calculator works

Group entering, passing, loop and entirely internal conductors by size. Then add clamps, each support type, device mounting allowances, entering grounds and terminal-block assemblies. Internal pigtails contribute to the largest physically present wire used for clamps/supports but do not add a conductor volume.

Required in³ = entering/passing + loop + clamp + support + device + grounding + terminal-block allowances. A device uses 2 × mounting gangs × largest connected conductor allowance per yoke. Entering grounds use one allowance for up to four, plus 0.25 for each additional ground.

Worked example

Four entering #12 conductors use 9.00 in³. One internal clamp adds 2.25 in³; one single-gang receptacle yoke adds 4.50 in³; two entering #12 grounds add 2.25 in³. Total = 18.00 in³. A verified 4 × 1-1/4 in square metal box provides 18.00 in³, so it passes exactly. The suggested preset can differ because suggestions sort all supported shapes by volume and identifier.

More original examples

Three entering #12 conductors without devices or internal hardware require 3 × 2.25 = 6.75 in³. Six entering #12 grounds require [1 + 2 × 0.25] × 2.25 = 3.375 in³; with four entering #12 circuit conductors, the combined allowance is 12.375 in³ before devices or hardware.

NEC references

NEC 2023: 314.16(A); 314.16(B)(1); 314.16(B)(2); 314.16(B)(3); 314.16(B)(4); 314.16(B)(5); 314.16(B)(6); 300.14. These are reference identifiers, not reproduced code text. Read our methodology and verification limits.

For product-specific evidence, consult Southwire manufacturer resources and Hubbell RACO box documentation. We do not publish a full reference table.

Limitations

Only ordinary, unpartitioned boxes and AWG 18 through 6. No 4 AWG or larger, conduit bodies, fixture-canopy exceptions, special integrated assemblies or unconfirmed extension-ring volume. Verify marked volume, physical depth, conductor bends and device listing; a volume comparison alone does not prove installation suitability.

For estimation only. Results compare loads under the selected NEC method; they do not guarantee permit approval or code compliance. Verify with your local adopted code and a licensed electrician.

FAQ

Do internal pigtails count?

Entirely internal pigtails have zero conductor allowance here, but their size affects the largest physical conductor for internal clamp/support allowances.

How do six grounding conductors count?

The first four share one allowance; two more add a half allowance. Use the largest entering ground size.

Is a duplex receptacle two devices?

A duplex receptacle on one strap is one yoke. Enter actual mounting gangs for unusually wide devices.

What about an unbroken loop?

In this supported six-inch free-length model, a loop at least 12 inches long receives two conductor allowances. Shorter loops receive one.

Can I add extension-ring volume?

Only enter independently verified usable marked volume. Unknown additional volume is not accepted.

Why is a different-shaped box suggested?

Suggestions choose the first supported preset by volume and identifier, not the smallest product on the market or a physically equivalent shape.

Related calculators

Planning an EV charger or panel upgrade? Run a load calculation.

Coming soon

Pro is coming soon — join early access

Tell us what would save you time on the next job.

Planned price
$19/month
Planned to include saved projects, branded reports and customer proposals. Panel schedules and photo entry are under consideration. Price and features aren't final.
Most wanted features (optional, choose up to 2)

Only for Pro launch notices and early-access invitations. No automatic email is sent. Data is retained until 12 months after the Pro launch notice, or deleted earlier on request. For deletion: support@electricalloadcalcs.com Requests are handled within 30 days. Privacy details.